2009
2
Apr
21:52

grunt labor

   Posted by: arcanai   in home sweet home, pix

that’s what i’ve felt like this week.  i guess it makes up for the three weeks of sloth from being sick.  i started saturday with a good four hours to clean out the bathroom and tape everything off.  sunday turned out to be unproductive but i spent my lunch hour monday drawing lines and then seven hours monday night painting.  tuesday night was another seven hours of painting.  yep, that’s nineteen hours to paint a bathroom and small hall.  nineteen hours of MY time, that doesn’t include the five or six hours that hubby pitched in.  so really that’s twenty-five man-hours on this one, small project.  i never expected it to be such a monster.  last night, i scrubbed down both bathrooms top to bottom.  and we did some general picking up to prepare for our company this weekend.  i feel much better about the matter. 

as for the bathroom, i think things came out beautifully, all things considered.  it sure as heck should look good after nineteen hours!  the blue is a little brighter than i thought it would be but it’s growing on me.  no matter what, it looks a thousand times better than it did.  once we get the bedroom painted, it’ll really look complete. 

hall leading to master bath

hall leading to master bath

This entry was posted on Thursday, April 2nd, 2009 at 21:52 and is filed under home sweet home, pix. You can follow any responses to this entry through the RSS 2.0 feed. You can skip to the end and leave a response. Pinging is currently not allowed.

4 comments so far

Jonna
 1 

Looks Awesome!! Great Job!

April 3rd, 2009 at 9:29
 2 

what’s the bottom color? it’s difficult to discern

April 3rd, 2009 at 10:35
 3 

it’s a shade of brown

April 3rd, 2009 at 11:22
 4 

Looks awesome! Can you drive down to Miami and do that to my house???

April 3rd, 2009 at 17:04

Leave a reply

Name (*)
Mail (will not be published) (*)
URI
Comment